| A. |
Area Pagar Mess Direksi - Belakang WHS 02/03 Tangki ROP |
0.00% |
| 1 |
Pekerjaan bongkar pagar lama tangki ROP (60m x 2m) |
|
|
|
Rp 0 |
0.00% |
| 2 |
Pekerjaan Sepatu beton |
|
|
|
Rp 0 |
0.00% |
| 3 |
Pekerjaan pasang kembali pagar |
|
|
|
Rp 0 |
0.00% |
| 4 |
Pekerjaan tapak |
|
|
|
Rp 0 |
0.00% |
| 5 |
Pekerjaan Kolom |
|
|
|
Rp 0 |
0.00% |
| 6 |
Pekerjaan Balok Sloof |
|
|
|
Rp 0 |
0.00% |
| 7 |
Pekerjaan dinding bata |
|
|
|
Rp 0 |
0.00% |
| 8 |
Pekerjaan dinding Plaster |
|
|
|
Rp 0 |
0.00% |
| 9 |
Pekerjaan Ring Balok |
|
|
|
Rp 0 |
0.00% |
| 10 |
Pekerjaan Pagar BRC |
|
|
|
Rp 0 |
0.00% |
| B. |
Area COM |
0.00% |
| 1 |
bobok |
|
|
|
Rp 0 |
0.00% |
| 2 |
Pekerjaan Sepatu beton |
|
|
|
Rp 0 |
0.00% |
| 3 |
Pekerjaan pasang kembali pagar |
|
|
|
Rp 0 |
0.00% |
| 4 |
Pekerjaan tapak |
|
|
|
Rp 0 |
0.00% |
| 5 |
Pekerjaan Kolom |
|
|
|
Rp 0 |
0.00% |
| 6 |
Pekerjaan Balok Sloof |
|
|
|
Rp 0 |
0.00% |
| 7 |
Pekerjaan dinding bata |
|
|
|
Rp 0 |
0.00% |
| 8 |
Pekerjaan dinding Plaster |
|
|
|
Rp 0 |
0.00% |
| 9 |
Pekerjaan Ring Balok |
|
|
|
Rp 0 |
0.00% |
| 10 |
Pekerjaan Pintu |
|
|
|
Rp 0 |
0.00% |
| 11 |
Pekerjaan Pagar BRC |
|
|
|
Rp 0 |
0.00% |
| C. |
Area SEP |
0.00% |
| 1 |
Bobok Gali |
|
|
|
Rp 0 |
0.00% |
| 2 |
Pekerjaan Sepatu beton |
|
|
|
Rp 0 |
0.00% |
| 3 |
Pekerjaan Pembuatan Pintu gerbang |
|
|
|
Rp 0 |
0.00% |
| 4 |
Pekerjaan tapak |
|
|
|
Rp 0 |
0.00% |
| 5 |
Pekerjaan Kolom |
|
|
|
Rp 0 |
0.00% |
| 6 |
Pekerjaan Balok Sloof |
|
|
|
Rp 0 |
0.00% |
| 7 |
Pekerjaan dinding bata |
|
|
|
Rp 0 |
0.00% |
| 8 |
Pekerjaan dinding Plaster |
|
|
|
Rp 0 |
0.00% |
| 9 |
Pekerjaan Ring Balok |
|
|
|
Rp 0 |
0.00% |
| 10 |
Pekerjaan Pagar BRC |
|
|
|
Rp 0 |
0.00% |
| D. |
Pembuatan Pos Satpam |
0.00% |