LAPORAN PROGRESS
06 Jun 2026
LAPORAN PROGRESS

Perbaikan dan sekat bak Cooling Tower ROP

PIC PROYEK
Adnan
PEMBORONG
Suripto
TOTAL ESTIMASI (Dibulatkan)

Rp 0

REKAPITULASI BIAYA (F.C RECAP)
NO DESKRIPSI PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA BOBOT (%)
A. Pekerjaan begisting 0.00%
B. Pekerjaan cor dinding 0.00%
C. Pekerjaan fiber dinding 0.00%
D. Pekerjaan bak trap 0.00%
E. Pekerjaan instalasi pipa 0.00%
F. Pekerjaan pembuatan atap 0.00%
TOTAL BIAYA KONSTRUKSI Rp 0100%
Over Estimate 5% Rp 0
GRAND TOTAL Rp 0
DIBULATKAN Rp 0
LAPORAN KEMAJUAN HARIAN (M-Series)
NO DESCRIPTION VOL UNIT M-2 HARIAN M-3 VOLUME 0% AKUMULASI PROGRESS
SSRKJSM HR AK HR AK % TOT
A Pekerjaan begisting 0.00% 0.00%
B Pekerjaan cor dinding 0.00% 0.00%
C Pekerjaan fiber dinding 0.00% 0.00%
D Pekerjaan bak trap 0.00% 0.00%
E Pekerjaan instalasi pipa 0.00% 0.00%
F Pekerjaan pembuatan atap 0.00% 0.00%
AVERAGE / TOTAL 0.00%
TOTAL PROGRESS KESELURUHAN 0.00%
TIME SCHEDULE (M-Series)
NO DESCRIPTION BOBOT (%) SCH TAHUN 2026
M-3 M-4 M-5 M-6 M-7 M-8 M-9 M-10 M-11 M-12 M-13 M-14 M-15 M-16 M-17
1
Pekerjaan begisting
-
0.00% SCH
REAL
2
Pekerjaan cor dinding
-
0.00% SCH
REAL
3
Pekerjaan fiber dinding
-
0.00% SCH
REAL
4
Pekerjaan bak trap
-
0.00% SCH
REAL
5
Pekerjaan instalasi pipa
-
0.00% SCH
REAL
6
Pekerjaan pembuatan atap
-
0.00% SCH
REAL
TOTAL 100.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
TIME SCHEDULE
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
PROGRESS MINGGUAN
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
AKUMULASI PROGRESS 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
EVALUASI MINGGUAN
PV
(Progress
Variance)
=
0.00% 0.00%
0.00%
x 100 =
0.00%
Notes:
EVALUASI AKUMULASI
PV
(Progress
Variance)
=
0.00% 0.00%
0.00%
x 100 =
0.00%
Notes:
PROGRESS SCH ACT SELISIH KETERANGAN
Mingguan0.00%0.00%0.00%
Akumulasi0.00%0.00%0.00%
DIBUAT DIPERIKSA DISETUJUI
Nama:
Jabatan:
Tanggal:
Nama:
Jabatan:
Tanggal:
Nama:
Jabatan:
Tanggal: