LAPORAN PROGRESS
06 Jun 2026
LAPORAN PROGRESS

Pengembangan mini CWP tahap II bangunan MP 1

PIC PROYEK
Hidayat
PEMBORONG
Fikri
TOTAL ESTIMASI (Dibulatkan)

Rp 0

REKAPITULASI BIAYA (F.C RECAP)
NO DESKRIPSI PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA BOBOT (%)
A. Pekerjaan Blowplang 0.00%
B. Pekerjaan Galian Tanah dan Cerucuk 0.00%
C. Pekerjaan Lantai Kerja (K-125) 0.00%
D. Pekerjaan tapak Pondasi 1,20 m x 1,20 mx 0,35m x 32 unit 0.00%
E. Pekerjaan Pondasi Lantai (K-300) 0.00%
F. Pekerjaan rolag bata 0.00%
G. Pekerjaan cor sloof induk 0,40m x 0,60m x 186m (K-300) 0.00%
H. Pekerjaan Sloof anak 0,20m x 0,30m x 240m (K-300) 0.00%
I. Pekerjaan Cor Lantai Beton bertulang 24m x 30m x 0,15m (K-300) 0.00%
TOTAL BIAYA KONSTRUKSI Rp 0100%
Over Estimate 5% Rp 0
GRAND TOTAL Rp 0
DIBULATKAN Rp 0
LAPORAN KEMAJUAN HARIAN (M-Series)
NO DESCRIPTION VOL UNIT M-23 HARIAN M-24 VOLUME 0% AKUMULASI PROGRESS
SSRKJSM HR AK HR AK % TOT
A Pekerjaan Blowplang 0.00% 0.00%
B Pekerjaan Galian Tanah dan Cerucuk 0.00% 0.00%
C Pekerjaan Lantai Kerja (K-125) 0.00% 0.00%
D Pekerjaan tapak Pondasi 1,20 m x 1,20 mx 0,35m x 32 unit 0.00% 0.00%
E Pekerjaan Pondasi Lantai (K-300) 0.00% 0.00%
F Pekerjaan rolag bata 0.00% 0.00%
G Pekerjaan cor sloof induk 0,40m x 0,60m x 186m (K-300) 0.00% 0.00%
H Pekerjaan Sloof anak 0,20m x 0,30m x 240m (K-300) 0.00% 0.00%
I Pekerjaan Cor Lantai Beton bertulang 24m x 30m x 0,15m (K-300) 0.00% 0.00%
AVERAGE / TOTAL 0.00%
TOTAL PROGRESS KESELURUHAN 0.00%
TIME SCHEDULE (M-Series)
NO DESCRIPTION BOBOT (%) SCH TAHUN 2026
M-17 M-18 M-19 M-20 M-21 M-22 M-23 M-24 M-25 M-26 M-27 M-28 M-29 M-30 M-31
1
Pekerjaan Blowplang
-
0.00% SCH
REAL
2
Pekerjaan Galian Tanah dan Cerucuk
-
0.00% SCH
REAL
3
Pekerjaan Lantai Kerja (K-125)
-
0.00% SCH
REAL
4
Pekerjaan tapak Pondasi 1,20 m x 1,20 mx 0,35m x 32 unit
-
0.00% SCH
REAL
5
Pekerjaan Pondasi Lantai (K-300)
-
0.00% SCH
REAL
6
Pekerjaan rolag bata
-
0.00% SCH
REAL
7
Pekerjaan cor sloof induk 0,40m x 0,60m x 186m (K-300)
-
0.00% SCH
REAL
8
Pekerjaan Sloof anak 0,20m x 0,30m x 240m (K-300)
-
0.00% SCH
REAL
9
Pekerjaan Cor Lantai Beton bertulang 24m x 30m x 0,15m (K-300)
-
0.00% SCH
REAL
TOTAL 100.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
TIME SCHEDULE
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
PROGRESS MINGGUAN
0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
AKUMULASI PROGRESS 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
EVALUASI MINGGUAN
PV
(Progress
Variance)
=
0.00% 0.00%
0.00%
x 100 =
0.00%
Notes:
EVALUASI AKUMULASI
PV
(Progress
Variance)
=
0.00% 0.00%
0.00%
x 100 =
0.00%
Notes:
PROGRESS SCH ACT SELISIH KETERANGAN
Mingguan0.00%0.00%0.00%
Akumulasi0.00%0.00%0.00%