| PEKERJAAN | TARGET | BOBOT | PROGRESS | REAL | AKSI |
|---|---|---|---|---|---|
|
A.
Pekerjaan persiapan
|
|
||||
|
1.
Pematangan Tanah
|
- | 100.00% | 100% |
|
|
|
2.
Pemasangan bowplang
|
- | 100.00% | 100% |
|
|
|
B.
Pekerjaan pondasi
|
|
||||
|
1.
Gali tanah dan cerucuk
|
- | 100.00% | 100% |
|
|
|
2.
Tapak pondasi
|
- | 100.00% | 100% |
|
|
|
3.
Rolaq bata
|
- | 100.00% | 100% |
|
|
|
4.
Sloof
|
- | 100.00% | 100% |
|
|
|
5.
Penimbunan
|
- | 100.00% | 80% |
|
|
|
C.
Pekerjaan dinding
|
|
||||
|
1.
kolom
|
- | 100.00% | 0% |
|
|
|
2.
Balok
|
- | 100.00% | 0% |
|
|
|
3.
Pasang Dinding bata
|
- | 100.00% | 0% |
|
|
|
4.
Plaster
|
- | 100.00% | 0% |
|
|
|
D.
Pekerjaan Lantai
|
|
||||
|
1.
Cor Lantai bertulang
|
- | 100.00% | 0% |
|
|
|
2.
Keramik Lantai
|
- | 100.00% | 0% |
|
|
|
E.
Pekerjaan pintu dan Jendela
|
|
||||
|
1.
Pintu utama dan kusen
|
- | 100.00% | 0% |
|
|
|
2.
Pintu kamar mandi dan kusen
|
- | 100.00% | 80% |
|
|
|
3.
Jendela dan kusen
|
- | 100.00% | 0% |
|
|
|
4.
Ventilasi jendela dan pintu
|
- | 100.00% | 0% |
|
|
|
5.
Ventilasi kamar mandi
|
- | 100.00% | 0% |
|
|
|
F.
Pekerjaan atap
|
|
||||
|
1.
Kuda-kuda rangka baja ringan
|
- | 100.00% | 0% |
|
|
|
2.
Atap dan rangka
|
- | 100.00% | 0% |
|
|
|
3.
Kanopi
|
- | 100.00% | 0% |
|
|
|
G.
Pekerjaan plafond
|
|
||||
|
1.
Plafon dan Rangka
|
- | 100.00% | 0% |
|
|
|
H.
Pekerjaan kamar mandi dan toilet
|
|
||||
|
I.
Pekerjaan sanitasi
|
|
||||
|
1.
Sanitasi air kotor
|
- | 100.00% | 0% |
|
|
|
2.
Septitank
|
- | 100.00% | 0% |
|
|
|
J.
Instalasi Air Bersih
|
|
||||
|
1.
Sanitasi Air Bersih
|
- | 100.00% | 0% |
|
|
|
K.
Pekerjaan Instalasi Listrik
|
|
||||
|
1.
Instalasi Listrik dan Penerangan
|
- | 100.00% | 0% |
|
|
|
L.
Pekerjaan Finishing
|
|
||||
|
1.
Pekerjaan Dinding
|
- | 100.00% | 0% |
|
|
|
2.
Pengecatan Plafon
|
- | 100.00% | 0% |
|
|
|
M.
Pekerjaan Tambahan
|
|
||||
|
1.
Tiang Teras
|
- | 100.00% | 0% |
|